Sign In | Join Free | My himfr.com
Home > Top Hat Roll Forming Machine >

16 Stations Top Hat Roll Forming Machine With Framous Electric Elements with GI Steel 2.0mm Thickness

    Buy cheap 16 Stations Top Hat Roll Forming Machine With Framous Electric Elements with GI Steel 2.0mm Thickness from wholesalers
     
    Buy cheap 16 Stations Top Hat Roll Forming Machine With Framous Electric Elements with GI Steel 2.0mm Thickness from wholesalers
    • Buy cheap 16 Stations Top Hat Roll Forming Machine With Framous Electric Elements with GI Steel 2.0mm Thickness from wholesalers
    • Buy cheap 16 Stations Top Hat Roll Forming Machine With Framous Electric Elements with GI Steel 2.0mm Thickness from wholesalers
    • Buy cheap 16 Stations Top Hat Roll Forming Machine With Framous Electric Elements with GI Steel 2.0mm Thickness from wholesalers
    • Buy cheap 16 Stations Top Hat Roll Forming Machine With Framous Electric Elements with GI Steel 2.0mm Thickness from wholesalers

    16 Stations Top Hat Roll Forming Machine With Framous Electric Elements with GI Steel 2.0mm Thickness

    Ask Lasest Price
    Brand Name : Saibo
    Model Number : Hat profile
    Certification : CE/ISO
    Supply Ability : negotiation
    Delivery Time : 60 working days after received deposit
    • Product Details
    • Company Profile

    16 Stations Top Hat Roll Forming Machine With Framous Electric Elements with GI Steel 2.0mm Thickness

    16 Stations with Rectify Top Hat Roll Forming Machine With Framous Electric elements

    How to maintain the machine
    1. Gear box
    ① Every three months check the oil in the gear box if it is enough.
    ② Every six months check the oil in the gear box if it is dirty, if dirty please replace all. Noted, before you change the oil, put away the old oil first, then add new gear oil.
    ③ Gear oil No: 330# gear oil.
    ④ How much gear oil you need to add: when add the gear oil, added to the viewport position is ok.
    2. Reducer
    ① Every three months check the oil in the reducer if it is enough.
    ② Every six months check the oil in the reducer if it is dirty, if dirty please replace all. Noted, before you change the oil, put away the old oil first, then add new gear oil.
    ③ Gear oil No: 330# gear oil.
    ④ How much gear oil you need to add: when add the gear oil, added to the viewport position is ok.
    3. Screw of cutting system
    ① Add high speed grease.
    ② According the attrition of the grease, usually 30 days add one time.

    Spectification

    1Roller materialGcr15
    2Roller station16 stations+ one station of rectify
    3Shaft diameter¢70mm
    4Machine structurewire electrode cutting
    5Machine framewhole plate welding
    6Feeding modeFeeding is adjustable by hand wheel
    7Machine power30kw+11kw
    8Servo power4kw
    9Material of blade mouldCr12, 58-62 HRC hardness
    10Cutting systemhydraulic track cutting system
    11Suitable materialGi, 0.8-2.0mm
    12Driven systemby gear box
    13Speed50m/min
    14Flatten system7 rollers, Up 3 rollers, down 4 rollers
    15Machine include auto stacker
    16Machine include 3T double head hydraulic un-coiler
    17Machine include cooling system


    Work flow
    3T Double head hydraulic de-coiler→ Flatten→ Roll forming→ Track cutting→ finished supporter.

    After Service
    a.One year guarantee for whole machine.
    b.24 hours technical support by email or calling
    c.If there is any problem found of the machine, we will repair it for free in one
    year.

    Machine loading,packing and shipping
    Usually the machies will be transported to the customer's workshop by shipping in containers. Sometimes, it aslo can be deliveried by train containers.
    The container that we are use are commonly 20 feet and 40 feet containers. 2 feet and 40 feet high containers and top open containers are used as well.
    It depends on the machines the customer ordered. We will try our best to find a most economical way for you.

    Machine lodaing pictures



    Installation and training:
    a.If buyers visit our factory and check the machine, we will teach you how to install and use the machine, and also train your workers/technician face to face.
    b.Without visiting, we will send you user manual and video to teach you to install and operate.
    C.If buyer needs our technician to go to your local factory, please arrange board and lodging and other necessary things.

    After Service
    a.One year guarantee for whole machine.
    b.24 hours technical support by email or calling
    c.If there is any problem found of the machine, we will repair it for free in one year.














































    Quality 16 Stations Top Hat Roll Forming Machine With Framous Electric Elements with GI Steel 2.0mm Thickness for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Zhangjiagang City Saibo Science & Technology Co.,Ltd
    *Subject:
    *Message:
    Characters Remaining: (0/3000)